The plant has
been operating a Quality Management system since February
1989 to control its operations. The system was upgraded in
December 2003 meeting the requirements of BS EN ISO 9001:2000
(Cert No. FM 00718). The Quality Management system is verified
by external independent auditors in- line with internal audit
schedules.
Inspection Equipment
3 axis Mitutoyo Coordinate measuring machine with
GEO-WIN and STAT-WIN software.
Mitutoyo Optical Projector
Inspection Services
Castings can be checked in a variety of ways
including (by approved standard laboratories)
Destructive Testing
Non Destructive Testing (NDT)
Wet Chemical analysis
All new dies or engineering changes are measured
and full dimensional ISIR's are issued on internal paperwork
or if required on customer specific forms.
Customer Approvals
Thales Defence ( Bracknell ) – Preferred
Supplier
Trak Microwave ( Dundee ) - Preferred Supplier
“The Quality of
our Services sets us Apart” |